Initial Plan of Activities (Training, Seminar, OJT, Workshop, etc)
TF |
type / by |
when |
Training title and terms |
1 |
Trainings in abroad
MAvA Malaysia |
Oct 2016
Jan 2017
Feb 2017
May 2017
|
Aerodrome Control #052 (2Month) Approach Control (Procedural) #053 (2.5M) Approach Control (Surveillance) #054(2.5M) Area Control (Procedural) #055 (3M) Area Control (Surveillance) #054(2.5M)
Aerodrome Control #052 (2.5M) Approach Control (Procedural) #053 (2.5M) Approach Control (Surveillance) #054(2.5M) Area Control (Surveillance) #054 (2.5M)
OJT Instructor Training #219 (2weeks)
General Instructor Training #211 (1week)
OJT Instructor Training #219 (2weeks)
TF1 Management Training in MAvA (1.2week) |
TA by Japanese expert |
Feb 2017
Mar 2017
Apr 2017 |
Operation Manual Review W/G formulation & Shearing technical findings Meeting (1day) F/U Training on Aerodrome Control (4days)
W/S on O/M Review & Task Assign (1day)
OJT Instructors Trainings (5days) F/U Training on Approach Control (4days)
|
|
2 |
Trainings in abroad
EUROCNTRL Luxemburg |
Oct 2016
Mar 2017
Jul 2017 |
Safety Assessment (Theoretical) (1week)
ATM Occurrence Inv & Ana (1week)
Safety Assessment (Practical) (1week) |
TA by Japanese expert |
Jul 2016
Apr 2017
|
Contingency Plan Basic Training (0.5day)
F/U Training on SMS (1day) W/S on CP Improvement (3days) CP Exercise (5days)
|
|
3 |
Trainings in abroad
GroupEAD Germany |
Aug 2016
|
AIS Training (3weeks) |
TA by Japanese expert |
Feb 2017
Apr 2017
|
AIS Seminar (1days) C/U Exercise Aero Chart Drawing1 (5days) NOTAM & AIP Procedure Dev. W/S (4days)
Training on Basic PANS-OPS FPD (6wks)
|
In the concept of Project design, the harmonization and alignment between the technical assistance (TA) by Japanese Experts and trainings in abroad are expected for maximizing the Project outcomes.